Answer: 55° F - 70° F Explanation: I think the best temperature to pour is 50 to 60 degrees for a nice and easy finish. |
Solid Solutions Concrete LLC |
Answer: 70° F - 85° F Explanation: Yes |
Capristo concrete |
Answer: 40° F - 55° F Explanation: Optimal minimum temp is 40 degrees, The use of additives and electrically warmed blankets can help after pour. |
United Concrete Contractors LLC |
|
ProMatcher |
Answer: 55° F - 70° F Explanation: Due to the curing process. |
RP Enterprises |
Answer: 40° F - 55° F Explanation: The best possible conditions for pouring concrete come in spring when the temperature is consistently in the 50's and the skies are cloudy. Good luck San Diego. |
COMMON SENSE FLOORING, INC. |
Answer: 70° F - 85° F Explanation: Concrete should be poured between 70-85 degree to insure that it does not evaporate water to quickly and has enough heat to dry properly. |
Treasure Coast Concrete Polishing |
|
ProMatcher |
Answer: 70° F - 85° F Explanation: That's just good weather in Bama |
Phoenix concrete services inc. |
Answer: 55° F - 70° F Explanation: 50 - 80 degrees. |
QUALITY CONTRACTORS |
Answer: 40° F - 55° F Explanation: temperature of new concrete should not be allowed to fall below 50 Fahrenheit during the curing period. |
Colorado Concrete |
|
ProMatcher |
Answer: 70° F - 85° F Explanation: Temperature is important but also is the wind . If wind is blowing hard and temperature is warm it can dry top of concrete out to fast resulting in shrinkage of concrete and having hairline cracks in finish. |
Concrete services |
Answer: 70° F - 85° F Explanation: To high of temperatures can suck all moisture out of cement too fast. |
Paradox Poly-Lift LLC |
Answer: 70° F - 85° F Explanation: Humidity is another factor. |
BellPro Construction LLC |
|
ProMatcher |
Answer: 70° F - 85° F Explanation: You wanted to dry but not too fast |
Garcias Concrete Service LLC, |